1. 3/3 + 2/3 = 5/3 (a)
2. (4 x 3600) + (2 x 1500) = 14.400 + 3.000 = 17.400 (d)
3. 2/(2+3) x 180 = 2/5 x 180 = 72
3/(2+3) x 180 = 3/5 x 180 = 108 (d)
4. sudut AOC = 180 - 30 = 150 (a)
5. keliling = 4a + 3a + 2a
45 = 9a
a = 5(a)
6. 7 (c)
7. 5 (a)
8. jumlah siswa = 5+10+20+15+10+5 = 65 (a)
9. lemari kedua = 148 / 4 = 37 (d)
10. (4.700.000 - 4.350.000) / 4.350.000 x 100% = 350.000/4.350.000 x 100% = 8,05% (d)
11. AB = √(AO²+OB²)
AB = √(3² + 4²) = √(9 + 16) = √25 = 5
keliling = 4 x AB = 4 x 5 = 20 (a)
12. 20 pekerja = 45 hari
18 pekerja = (45 x 20) / 18 = 50 hari (a)
13. (15.850.000 x 120%) / 24 = 19.020.000 / 24 = 792.500(b)
" Life is not a problem to be solved but a reality to be experienced! "
© Copyright 2013 - 2025 KUDO.TIPS - All rights reserved.
1. 3/3 + 2/3 = 5/3 (a)
2. (4 x 3600) + (2 x 1500) = 14.400 + 3.000 = 17.400 (d)
3. 2/(2+3) x 180 = 2/5 x 180 = 72
3/(2+3) x 180 = 3/5 x 180 = 108 (d)
4. sudut AOC = 180 - 30 = 150 (a)
5. keliling = 4a + 3a + 2a
45 = 9a
a = 5(a)
6. 7 (c)
7. 5 (a)
8. jumlah siswa = 5+10+20+15+10+5 = 65 (a)
9. lemari kedua = 148 / 4 = 37 (d)
10. (4.700.000 - 4.350.000) / 4.350.000 x 100% = 350.000/4.350.000 x 100% = 8,05% (d)
11. AB = √(AO²+OB²)
AB = √(3² + 4²) = √(9 + 16) = √25 = 5
keliling = 4 x AB = 4 x 5 = 20 (a)
12. 20 pekerja = 45 hari
18 pekerja = (45 x 20) / 18 = 50 hari (a)
13. (15.850.000 x 120%) / 24 = 19.020.000 / 24 = 792.500(b)